“How long will it take?” is usually the second question homeowners ask, right after “how much?” The honest answer depends on which part of the process you mean. The hands-on repair is often shorter than people expect. Everything around it — getting someone out, deciding on a plan, waiting for paperwork and weather, and letting the house settle before the final cosmetic touches — is what stretches the calendar.
This guide walks through each stage, what happens in it, and what tends to make it run longer or shorter. Every timeline here is a rough, general range. The schedule for your house comes from the specialist who evaluates it, and it should be written into the contract.
The timeline at a glance
| Stage | What happens | Longer or shorter | Rough duration |
|---|---|---|---|
| Scheduling the evaluation | You call or send a request; a visit is set up. | Season, demand, and how flexible your schedule is. | Varies — ask when you call. |
| The evaluation visit | Elevation readings, crack mapping, outside drainage check, crawlspace look on a raised house. | House size, crawlspace access, and whether there are additions. | Typically one to two hours. |
| Written quote | Findings and scope turned into an itemized quote. | Whether an engineer is involved and how complex the plan is. | Varies — ask at the visit. |
| Permit, if needed | Someone files with the city or parish. | Where the house is and what the office requires. | Varies by location — ask. |
| Exterior piers | Digging at the perimeter, setting piers, lifting, backfilling. | Pier count, depth, soil, and weather. | Typically one to a few days. |
| Interior piers | Breaking through flooring and slab inside, setting piers, patching. | Number of interior piers and furniture or flooring to move. | Adds time — ask how much. |
| Pier-and-beam releveling | Shimming, resetting or adding piers, replacing sills or beams from the crawlspace. | How much wood is rotted and how tight the crawlspace is. | Typically one to a few days; longer with heavy wood replacement. |
| Drainage work | Gutters, downspout extensions, regrading, or drains. | Scope, landscaping in the way, and weather. | Varies with scope — ask. |
| Crack repair and finish work | Sealing cracks, patching drywall, brick, and trim, adjusting doors. | How much the house moved and how long you wait to start. | Scheduled after the structural work. |
| Re-measurement | Elevation readings taken again and shared with you. | Whether it happens at the end of the job or after a follow-up visit. | Usually part of the last day or a follow-up. |
Getting the evaluation on the calendar
When you call (225) 535-8057 or send the form, your request is routed to one licensed local foundation specialist, who contacts you to schedule. Have the basics ready — what you are seeing, when it started, slab or raised — and a couple of times that work.
The evaluation itself
A thorough evaluation is not a five-minute look at one crack. The specialist should take elevation readings across the whole floor, map cracks inside and out, walk the outside for drainage, and — on a raised house — get into the crawlspace. Published guides put a typical foundation inspection at one to two hours. Larger houses, additions on a separate foundation, or a tight crawlspace add time.
Plan to be there. Walking the house with the specialist is the best time to ask the questions that matter, and it lets you point out the door that sticks only in summer or the crack you have been tracking.
From findings to a written quote
Ask how soon the written quote will follow the visit, especially if an engineer’s review is part of the plan. Either way, the quote should arrive itemized, with these four lines priced separately:
- 1Evaluation findingsWhat was measured and found — elevation readings, crack locations, construction type, likely cause.
- 2Drainage / moisture correctionGutters, grading, downspouts, or crawlspace moisture work that addresses why the soil is moving.
- 3Structural repairPiers, shims, or sill and beam replacement — with counts, locations, and depths stated.
- 4Finish / cosmeticDrywall, brick, trim, and door adjustments after the house moves — priced on its own line.
Then the timeline is partly yours. Foundation work is a significant decision, and taking time to read the quote, ask questions, or get a second evaluation is reasonable. Ask how long the quote is good for, so you are not rushed.
Permits
Check with the parish or city permit office, and ask the specialist who handles any permit. Settling that when you get the quote, rather than the week of the job, keeps it from holding up the start. The service areas page lists the parish offices.
How long the work takes, by job type
Exterior piers on a slab house
Exterior piering is dug from outside, at the perimeter. Each pier location is excavated, the pier is installed, and once the piers are in, the slab is lifted toward the agreed target and the holes are backfilled. Published guides put most foundation repairs at one to five days; more piers, deeper piers, or a lot of landscaping in the way add time. The foundation piering page explains what the crew is doing at each pier.
Interior piers
Interior piers support sections in the middle of a slab, so they usually mean moving furniture, cutting flooring, breaking through the slab, setting the pier, and patching afterward. That adds time on top of the exterior work. Ask what rooms will be affected and for how long.
Releveling a raised house
On a pier-and-beam house, the work happens in the crawlspace: re-shimming, resetting or adding piers, and replacing sills or beams. Heavy wood replacement takes longer, and rot that turns up once boards are opened can add time. The house leveling page explains how leveling works on raised and slab houses.
Drainage and moisture work
Gutters and downspout extensions are usually quick. Regrading or installing a drain takes longer, and depends on what is in the way. Some drainage work happens after the structural repair so new grading is not disturbed by digging at pier locations.
Crack repair
Sealing or injecting cracks is usually one of the shorter pieces, and it normally comes last, after the cause is fixed. Published ranges put crack repair at roughly $400 to $1,500. The cost guide has the rest.
Finish work and the final measurement
Finish and cosmetic work — drywall, brick, trim, door adjustments — is its own line on a good quote, and its timing should be stated too. Ask whether the specialist does that work or leaves it to you, and how long to wait before starting it.
The last step is re-measurement. Elevation readings taken after the work, compared with the readings from the evaluation, are how you know the house reached the agreed target. Ask for a copy, and keep it with the contract and any permit.
What slows a foundation job down
- Weather. Wet weather can delay excavation and other repair work. Ask how weather days are handled in the schedule.
- Hidden damage. Rot or a failed old repair found once work starts can add time and cost. Ask up front how that will be handled.
- Access. Tight side yards, landscaping, decks, or a low crawlspace slow the work.
- Plumbing. If a slab plumbing test or a leak repair is part of the plan, it has to be scheduled around the structural work.
- Decisions. Changing the scope after work starts almost always adds time.
How to keep it moving
- Have your photos, dates, and any old repair paperwork ready for the evaluation.
- Ask for the schedule — start date and expected duration — in the written contract.
- Clear furniture and storage from affected rooms and from around the foundation.
- Settle the permit question when you get the quote, not the week of the job.
- Agree in advance how rain days and hidden damage will be handled.
To get started, call (225) 535-8057 or send a request with what you are seeing.
Timeline questions
How long does foundation repair take?
Published guides put most foundation repairs at one to five days of work. The whole process — scheduling an evaluation, getting a quote, any permit, the work, and finish repairs afterward — takes longer than the work alone. Ask the specialist for a schedule in writing.
Can I stay in my house during foundation repair?
Many homeowners stay in the house, especially when the work is outside or in the crawlspace. Interior piers, utility shutoffs, or work under occupied rooms can change that. Ask during the evaluation what parts of the house will be affected and for how long.
Why does finish work happen after foundation repair?
Finish and cosmetic work is its own line on a good quote, so its timing can be planned on its own. Ask the specialist how long to wait before patching drywall, setting tile, or repainting.